PROJECT: TERMINAL D REMODEL AND NORTH CONCOURSE PHASE I, II AND III [ 500N ]

SUMMARY
Project Name TERMINAL D REMODEL AND NORTH CONCOURSE PHASE I, II AND III

Project Number 500N

Location George Bush Intercontinental Airport [ IAH ]

SCOPE
This project renovates the space occupied formerly by customs and immigration in Terminal D into more ticket counter space, VIP rooms and concession space. Renovation of the air conditioning system, installation of additional security system components, roof inspection and telecommunication are included in the project. Renovate terminal D Technology Infrastructure - new communication rooms will be constructed to segregate technology & security equipment from other building services related functions. Additional conduit capacity will be added, new electrical UPS equipment will be added. Back up HVAC Terminal D - Replace and update the fire/domestic water systems RCA - Design of a new 176,000 square foot, Six gate pier and ramp addition for new large and wide body aircraft to the Terminal D Mickey Leland International Airlines building at GBIAH The entire terminal design program is comprised of two distinct projects both of which are required to deliver the project whole. Project 500N represents the vertical pier design and engineering component and Project 500R represents the ramp and fueling design and engineering component. CM @ Risk The city intends to construct the project in two phases, each with a separate guaranteed maximum price (GMP) and delivery date: Phase I - Remodel current facility to be building code compliant including ADA which requires the replacement of the infrastructure mechanical, electrical, plumbing, fire protection, fire alarm, low voltage systems, voice data, purchase of new passenger loading bridges, support system and select interior finishes for delivery in 2013 Phase II - Construction of a new 155,000 square foot story pier addition with six (6) wide body capable aircraft gates for delivery in 2013 The FAA has approved this project and the alternate delivery method The project has been registered with USGBC (US green building council) with a LEED Goal of silver

SCHEDULE
RFQ Date 5/24/2008

Bid Advertise 7/18/2008

Big Opening Date 12/1/2008

Estimated Duration 1288 days
BUDGET
Design Budget $7,123,000

Design NTP Date 5/7/2009

Construction Budget $12,963,000

Construction NTP Date 1/5/2010

CONTACT INFORMATION

Houston Airport System
16930 JFK Boulevard
Houston, Texas 77032

281-233-3000 - phone

281-233-1874 - fax

Design PM
RANDY WILLIAMS
281-233-1095


Construction PM
RANDY WILLIAMS
281-233-1095