Upcoming CIP Projects

The following is a listing of upcoming projects for the Houston Airport System. Each project is identified by project number (first column), and related CIP numbers (2nd column) that correspond to the City of Houston’s Capital Improvement Program. The 3rd column indicates the location of the project; George Bush Intercontinental Airport (IAH), William P. Hobby Airport (HOU), Ellington Field (EFD), or System Level (HAS). The fourth column depicts the phase of the project (D = Design, C = Construction, O = Other). The spreadsheet gives a brief description of each component CIP. The sixth column lists the projected date for RFQ/Bids for this project.

Please remember the construction advertisement dates are approximately four months ahead of the construction appropriation date and design requests for proposal are approximately six months ahead of the design appropriation date.

The timing and budgets for the projects listed are subject to change at any time due to scheduling conflicts, availability of funding or scope modification. Please refer to the Houston Airport System website (www.fly2houston.com) for updates or contact one of the following:

Design and Construction
Adil Godiwalla, Acting Assistant Director - (281) 233-1934
Bob Nesbett, Chief Architect - (281) 233-1782

Planning and Programming
Monica R. Newhouse, Assistant Director - (281) 233-1973
Frank Crouch, Assistant Director - (281) 233-1954
Keith Goodwin, Chief of Capital Planning - (281) 233-1722

Public Safety
Frank Haley, Deputy Director - (281) 233-1835
Lisa Kent, Assistant Director, Public Safety & Technology - (281) 233-1971

**To download a PDF version of this report please Click Here.


Project No CIP No. Loc Phase DESCRIPTION Projected RFQ/BID Date Budget
(thousands)
Contact
637 A-0560.02 IAH C TERMINAL A PUBLIC RESTROOM 7/1/2009 1,000 Design & Construction
652 A-0588.01 IAH D REPLACE EXISTING INCINERATOR 8/1/2009 200 Design & Construction
500R A-0483.23 IAH C TERMINAL D - APRON WORK 9/1/2009 18,000 Design & Construction
621 A-0091.27 IAH C PHASE II & III EXPANSION CENTRAL PLANT 9/1/2009 16,000 Planning & Programming
634 A-0557.02 IAH C TERMINAL A/B POWER SUPPLY ELECTRICAL VAULTS 11/1/2009 5,270 Design & Construction
657 A-0589.01 IAH D UPGRADE LIFT STATION INCLUDING BACK-UP GENERATORS-FEMA 12/1/2009 500 Design & Construction
664 A-0478.01 IAH D DITCH N EXTENSION GREENS RD WEST OF OLD RANKIN RD - FEMA 12/1/2009 600 Design & Construction
665 A-0524.01 IAH D FLOOD CONTROL PROJ FOR WILL CLAYTON, JFK & GREENS - FEMA 12/1/2009 858 Design & Construction
671 A-0593.01 EFD D IMPLEMENT EFD DRAINAGE MASTER PLAN RECOMMENDATIONS - FEMA 12/1/2009 700 Design & Construction
672 A-0580.01 HOU D HOBBY DRAINAGE - FEMA 12/1/2009 350 Design & Construction
500N A-0483.30 IAH O REPLACEMENT OF TERMINAL D LOADING BRIDGES (7 BRIDGES) 1/1/2010 4,200 Design & Construction
466 A-0513.06 IAH D TERMINAL A & B GARAGE LEVEL RESEAL CONCRETE (R&R) 1/1/2010 150 Design & Construction
500N A-0483.03 IAH C TERMINAL D REMODELING PHASE II - UTILITIES & CODE 1/1/2010 44,250 Design & Construction
500N A-0483.24 IAH C TERMINAL D - CONCOURSE DEVELOPMENT - ONE PIER 1/1/2010 92,000 Design & Construction
641 A-0566.02 IAH C VERTICAL CIRCULATION AT TERMINAL A 2/1/2010 5,000 Planning & Programming
629 A-0564.01 EFD C REPLACE THE AIR TRAFFIC TOWER AT EFD 3/1/2010 3,200 Design & Construction
545B A-0362.11 HOU C CONSTRUCTION - AIRPORT SERVICES COMPLEX UPGRADE 4/1/2010 3,209 Design & Construction
406 A-0503.02 IAH C FUEL STORAGE FACILITY IMPROVEMENTS 5/1/2010 14,000 Design & Construction


Copyright © 2004-2009 - Houston Airport System.C:487449|1904D2102D2104|189
All rights reserved | Privacy Policy | Terms & Conditions
Comments or Questions: Comment Form or Email Us
Designed by Derek Consulting and Advarion Incorporated