Operations & Maintenance Job Order Contract





© Houston Airport System

The Houston Airport Systems Operations and Maintenance JOC Program, administered by James Beehner, Project Manager, consists of those projects that are not intended to alter or change the asset or to increase the useful life of the asset, but rather to sustain the asset in its present condition. Examples: Painting, remodeling costs, compressor replacement in an air conditioning unit.

It is further defined as projects or activities that recurs on an ongoing basis and keeps the assets in useable condition; simply restores a fixed asset to its former condition, addressing normal wear and tear; does not add substantially to the value of the asset; facilitates asset utilization for its original estimated useful life; and does not significantly extend the useful life of the existing asset.

Please check Fly2Houston.com and the associated links below for updates related to HAS' Operation and Maintenance Job Order Contract projects.

Project Location Description
01-HOU-2011 HOU INSTALL DOUBLE DOORS
03-IAH-2011
IAH OFFICE BUILD OUT
04-IAH-2011 IAH  REPLACE DOMESTIC WATER HEATER EXCHANGERS
05-IAH-2011 IAH REPAIR D-7 CONCRETE BREAK OUT