|
Scope of work is to provide a 8’ high steel reinforced aluminum and tempered glass partition anchored to the concrete floor in Terminal E level 2, at the TSA checkpoint in George Bush Intercontinental Airport, Provide electrical power to the electrically operated doors as required.
|